TECHNICAL INSULATION · COLD PIPEWORK

Cold pipework insulation

Cold and refrigeration pipework insulation, chilled-water pipework insulation and condensation-control work for projects across the EU.

Request a quote

Cold pipework insulation and condensation control

For cold and refrigeration pipework, insulation material and thickness depend on operating temperature, ambient conditions, condensation risk and project documentation.

Continuity at joints, valves and other details is important so that the installed insulation matches the actual service conditions.

Cold and refrigeration pipework insulation

Refrigeration and chilled-water pipework

TREE undertakes insulation of refrigeration pipework, chilled-water pipework and other defined cold-service lines according to the agreed project scope.

Flexible elastomeric insulation and protective finishes are installed where specified by the design.

  • Refrigerant and cold pipework
  • Chilled-water pipework
  • Elastomeric insulation where specified
  • Protective cladding where required by the project

New installations and existing pipework

Cold-service insulation can follow new pipe installation or be contracted as a separate package on existing pipework where condition and access can be established clearly.

Where pipe installation and insulation are both included, the work sequence can be coordinated within the same project.

Projects across the EU

TREE undertakes cold-pipework insulation projects across the EU and can mobilise quickly depending on project scope, location and programme.

For a quotation, useful inputs are drawings or photographs, pipe diameters and lengths, operating temperatures, medium, specified material and thickness, location and programme.

Frequently asked questions

What determines the insulation for cold pipework?

Pipe dimensions, operating temperature, ambient conditions, condensation risk and project requirements are the main inputs.

Do you install elastomeric insulation?

Yes, where specified by the project and suitable for the service conditions.

Can insulation follow pipe installation?

Yes. It can be a separate work package or a planned follow-on phase.

Do you work on cold-pipework projects across the EU?

Yes. Project engagement depends on scope, location, programme and site conditions.

Can you quote from photographs only?

Photographs may be enough for an initial discussion, but a realistic quotation normally also requires pipe sizes, lengths, temperatures, medium, location and programme.

TREE D.O.O.

LET’S DISCUSS YOUR PROJECT

Send the project scope, location and planned date for fire protection, sprinkler installation, pipework or insulation.

Request a quote